Of course, Chen Xin is not an irresponsible person, but under the current situation, he really can't make any commitment to Mo Qingyan.

In fact, there is no commitment between him and Mo Qingyan. What he needs to give Mo Qingyan is only the recognition of emotion and the change of relationship, from a good brother to a lover.

What really matters is how to deal with the relationship between him and the two women in the future.

Chen Xin never had the experience of associating with two girls at the same time, and never thought that he would sleep in the same bed with Qin LAN and Mo Qingyan at the same time.

This makes him a little confused about the new relationship between the three at the moment.

So after saying some comforting words to Mo Qingyan and agreeing to Qin Lan's unequal treaties, Chen Xin fled his RV with some embarrassment and returned to the construction site.

For Chen Xin's escape, Qin LAN and Mo Qingyan are a little angry. After all, no woman would want a man to run away on the first day of the relationship.

However, they are also magnanimous to show understanding, willing to give Chen Xin, but also to give themselves some time to adapt to the changes in the relationship between the three.

To be honest, for Qin LAN and Mo Qingyan, it does take time to adapt to the changes in their relationship.

After all, even if Qin LAN has already reached an agreement with Mo Qingyan, their previous relationship is also very good, but neither Chen Xin nor Qin LAN and Mo Qingyan ever imagined that their relationship would become like this.

So it's not just Chen Xin who needs time to adapt and adjust, it's the same with them.

After returning to the construction site, Chen Xin quickly put his energy back to work. Although he has just experienced the changes that have had a significant impact on his life, his work still needs to be completed seriously.

The workers who went home for the New Year holiday yesterday have already returned to the construction site early in the morning, and they are working energetically at this time.

Chen Xin put on his power armor and went down to the bottom of the snow pit. At this time, the workers were tearing down the exposed concrete floor under the ground, preparing to lay a foundation for the heating hub.

The whole heating hub is more than 10 meters high, which is almost equivalent to a four or five story building. A complete set of evaporative heat dissipation devices will be installed inside, making the completed heating hub look like an iron tower.

Of course, the current heating hub is just a pile of parts that have not yet been assembled. Workers need to assemble them bit by bit after laying the foundation.

Chen Xin, who went down to the bottom of the snow pit, saw that the workers were hitting the cement on the ground with air picks, but the effect was not good, and the construction progress was not ideal.

Chen Xinzao had expected that after all, the low temperature of tens of degrees below zero has already frozen the ground hard. Even the ice layer formed by the nearby snow is as hard as granite. It is not easy to drill through the already hard cement ground and make enough holes on the ground to serve as the foundation of the heating hub.

However, Chen Xin obviously won't just watch the workers spend time and effort slowly smashing the floor. Chen Xin, with power armor, can easily break the cement on the ground and make holes that meet the requirements of the design drawings.

"Get out of the way, let me do it." Chen Xin told the workers to stop their work and move out of the way. Then he squatted down and controlled the mechanical arm to the position where the workers had just broken it with the air pick.

It was just hit by the workers with a pneumatic pick, but there were only a few white spots on the ground, and there was no sign of rupture.

Obviously, the freezing brought by the cold makes the already solid cement more solid and hard to break through.

But it didn't work in front of Chen Xin's mechanical arm. With all kinds of tools on the mechanical arm working together, Chen Xin soon cut a piece of cement directly from the ground.

Although the cement is very hard and cannot be broken by air pick, it does not mean that it can resist the cutting of cutting machine.

After cutting the cement, it doesn't mean that the work becomes easier, but it's relatively less difficult to deal with.

Because under the cement is gravel and soil. These are the foundations filled in the past when the square was built, and they were pressed by the road roller. While ensuring the smoothness of the ground, the soil and gravel under them were pressed more tightly.

If this is the case, it will be over for the workers to dig with hoes. However, the cold and low temperature turns the soil into frozen soil, which can not be dug casually by manpower.

In fact, Chen Xin asked the workers to have a try. Even if he used the air pick, he just made a small pit on the gravel and frozen soil. Although it was not useless, it would take a long time for Chen Xin to use the air pick to make the foundation he needed on the ground.

In the face of this situation, Chen Xin can only continue to wave his mechanical arm.

So, in the eyes of the workers, Chen Xin's mechanical arm is nearly ten times faster than them, and has made all the foundations needed for the construction of the heating hub on the ground."Well, the foundation has been finished, and the next construction is up to you." Chen Xin got up from the ground and felt that his waist was a little sour, so he told the workers to continue the construction, and then he climbed out of the snow pit.

Although the workers are very surprised at the efficiency of Chen Xin's power armor, they can only envy it. When it's their turn to work, they still have to use their hard-working hands.

According to Chen Xin's requirements on the drawings, several main support columns of the heating hub are embedded in the foundation just laid. Other supports are assembled according to the drawings. After the main support columns are fixed and kept horizontal and vertical, the water mud is poured into the foundation.

Of course, the cement used by the workers is no longer the ordinary cement in the past. Although that kind of cement is not unusable, the temperature must be raised to above zero. For Chen Xin, they do not have such construction conditions for the time being.

So they use antifreeze cement with antifreeze agent and water reducing agent to ensure that the cement will not freeze because of the water setting too fast in the process of use, resulting in cavities and other phenomena in the cement.

These workers are skilled workers, so there is no problem in this step, all the support columns are very smooth in accordance with the construction requirements to complete the cement pouring.

And because the weather is too cold, the cement has soon frozen as hard as stone, firmly fixed the support column of the heating hub on the ground.

www.novelhall.com , the fastest update of the webnovel!