"At present, the land clearing and leveling work has been completed, and we are currently excavating the foundation of the dome and the foundation of the urban architectural planning part." In a meeting room of the construction site, the engineer is introducing the construction progress of the project to Chen Xin.

The excavation of building foundation is the most important part of the whole construction project. In a sense, it is not too much to regard it as the most important part.

The foundation of "ten thousand tall buildings rising from flat ground" is the foundation that determines whether the building is firm and durable.

If the foundation of a building is not well laid, even if the building is built, it is a paper house that can be pushed down.

For Yanguo, a big country in infrastructure construction, there is no need to emphasize this point. The engineering team of Yanguo can complete the construction according to the requirements of the project without reminding.

"Well, I've seen that just now. It looks like you've done a good job." With a smile on his face, Chen Xin seems to be very satisfied with the construction progress of the engineering team.

When Chen Xin said this, the engineer immediately laughed. Although Chen Xin is not his superior leader, it is obvious that Chen Xin's recognition is still a happy thing for him.

However, while praising Chen Xin, he also asked the engineer, "do you excavate the building foundation first, and then construct other supporting facilities?"

This is what Chen Xingang was curious about when he visited the construction site. The workers are digging the foundation very deep, but they are basically limited to the scope of the buildings planned in the design drawings.

The rest of the land was only leveled and not excavated.

However, according to the design drawings, various supporting facilities will also be built on the non building part of the land, so Chen Xin has this question.

After all, it's a whole city. It's impossible to build only houses, and ancillary facilities such as sewers, drainage pipes and heating pipelines will also be laid, not to mention the city level power supply lines and dome lighting system.

In the future, in this Dome City, lighting is needed to simulate the change of light, so as to artificially create the difference between day and night.

"Yes, according to the construction plan, the progress of this phase is mainly to excavate the building foundation. As for the supporting facilities, according to the construction plan, the construction will be carried out after the foundation is completed." The engineer explained to Chen Xin that although Chen Xin is not his boss, Chen Xin's identity is undoubtedly more important than his boss, and the engineer needs to answer any questions he has.

After listening to the engineer's explanation, Chen Xin didn't have any special views or opinions. He didn't know much about engineering construction, and only asked what he didn't know.

However, after the engineer explained, Chen Xin still pretended to be clear and nodded, did not ask anything more.

However, a designer on one side took the initiative and said to Chen Xin: "this is mainly due to the special situation of the dome city. According to our plan, we will first complete the main construction of the heating tower and the dome, and then raise the temperature under the dome to restore the temperature of the whole construction environment to above zero. In this way, the construction difficulty can be greatly reduced, It can also make the original construction machinery work. "

Chen Xin can understand this. Most of the original construction machinery used diesel oil. When the diesel oil reaches tens of degrees below zero, even the high-grade diesel oil is easy to condense, which makes the diesel engine unable to start.

Not to mention that the construction machinery itself is very rough design, and there is no wind and cold proof design for the cab. Even if the driver has protective clothing, the control lever will freeze in this weather.

However, if the dome insulation can raise the temperature of the construction site under the dome to above zero, these construction machinery which can not be used can be put to great use.

After all, even with the help of Engineering Titan, excavation in permafrost and ordinary soil are two completely different difficulties.

Therefore, when formulating the construction scheme, it was proposed that the dome and energy tower should be completed first. In this way, the power can be obtained through the energy tower to ensure the construction power, and the temperature of the whole construction site can be warmed by the dome insulation, so that the frozen soil can melt and the construction difficulty can be reduced.

"This has been determined before, but I'm not worried about it." Chen Xin nodded and said another thing: "the dome city is an ecological city, and the ecological environment is the most important for the city, so I hope you can also pay attention to this problem in the construction process."

Since Chen Xin does not emphasize this problem, the dome city emphasizes the important role of ecological reconstruction in its design. Therefore, all parts of the city are built around the core of green ecology.

Not only is the city full of green plants, including the city's water cycle, garbage disposal and a series of supporting facilities are designed with the most environmentally friendly design, in order to make the city create the most perfect ecological environment in the future.

And the construction itself is the most ecological destruction, even in the construction process, no matter how much attention, this will still more or less affect.

Chen Xin reminded that he also hoped to minimize its impact on the ecology in the construction process.

Even if there is no ecology on the construction site of the dome city now, after the dome is built, this is the problem that we have to face. If we don't make preparations now, it will be a big problem in the future.

For this problem, both engineers and designers have long been in mind. In the previous construction process, they also paid great attention to this point.

Now Chen Xin mentioned it again. Both of them nodded and said, "please rest assured that we will not be careless about ecological problems."

While assuring Chen Xin, the engineer also focused on their efforts in the construction process: "we are in strict accordance with the construction requirements in the construction process, and the environmental and ecological protection has been implemented to everyone from the beginning.

All workers have received relevant education, and relevant responsibilities have been made clear to people. We will make every effort to ensure that the whole construction is safe.

For the impact on the ecological environment caused by the construction process, the part that can be restored will be restored after the completion of the construction, and the part that cannot be restored will also minimize the damage as far as possible, so as to ensure that the impact on the ecology and environment during the construction process is minimized. "

"I'm relieved to hear that." Hearing this from the engineer, Chen Xin's face was even more smiling.

Now that he has decided to live here, Chen Xin certainly hopes that his new home will have a better environment in the future.

www.novelhall.com , the fastest update of the webnovel!