While Chen Xin was busy manufacturing artificial intelligence, the scientific research department of dome new town received instructions from their superiors to restart the construction plan of Dome City.

The construction plan of the dome city is an important project related to the national economy and people's livelihood and the future reconstruction of the blue star ecological environment before the invasion of alien organisms.

Therefore, when the country had just recovered from the plight after the disaster, it still invested a lot of resources to build the dome new city, and planned to invest enough scientific research in it to study the coexistence and development of ecosystem and human beings.

According to the original plan, after the dome new town is completed, the state will build more ecological domes in three to five years to expand the dome new town into a city group.

However, with the invasion of alien creatures, the construction of the new dome was cancelled, and the whole plan was shelved. All kinds of resources were sent to the front line against alien creatures. The Dome City, which costs a lot and is not helpful to the war, will naturally be suspended.

The only finished product of the whole dome urban construction plan has also become a resettlement site, which has resettled the population far beyond the design bearing limit.

Now, with the end of the civil war and the restart of various construction projects, this large-scale construction project that was stopped before has naturally been restarted under the promotion of some people.

However, the construction of the Dome City costs a lot. Even if the high-rise wants to restart the construction of the Dome City, it will not start construction immediately in the short term.

In particular, the project has been stopped for several years. Although the original drawings are still there, it also needs time to sort them out.

You know, even the drawings of an aircraft can be filled with a container, not to mention the drawings of a city?

Even if these drawings have been paperless, they are still very large data and need time to rearrange them.

Especially for the problems encountered in the construction of dome new town, the modifications made on the drawings used in the construction should also be fed back to the original drawings.

This is undoubtedly a huge project, which requires a lot of manpower to do these things.

And these people have to be professionals. Most people can't deal with these architectural drawings.

Therefore, several design institutes and their subordinate design institutes that still exist in China have been transferred, and a large number of professionals have been concentrated in the scientific research center, and some have carried out surveying and mapping in the dome new town.

Surveying and mapping the dome new city is naturally due. When the new city was built, it was not designed to accommodate more than 100000 people, and the space in the city is not allowed.

But what happened later, the city was crammed with more than 100000 people, which undoubtedly made the original architectural planning of the city a mess, and many original designs were modified.

Re mapping, in order to compare the current dome new town with the original drawings.

As for why we should go to the scientific research center, this is naturally the reason why the electronic version of the design drawings of dome new town is stored in the supercomputer of the scientific research center.

Moreover, the scientific research center is large and has a virtual illusion. You can directly simulate the drawings and calculate the differences through the supercomputer. Isn't it easier than comparing yourself with the vast sea of drawings and data?

————————————

Chen Xin was surprised that the state would restart the construction of the dome city.

In his capacity, he can naturally get access to more information that other people can't get access to. Through this information, Chen Xin can clearly understand that the current situation of the country is not as good as expected.

Despite the end of the domestic war, the country has shifted its focus back to domestic construction, but now it has to support the European battlefield on the one hand and build a new defense line in the Middle East on the other hand. It can be said that the domestic resource consumption is still very large.

Despite the European supplement and the considerable output provided by the domestic small individual contracted mines, the current domestic life still needs to be calculated.

At this time, Chen Xin did not agree to restart the large-scale construction project of Dome City.

In particular, the original design intention of the dome city was to establish an ecological city rather than a residential city, which is very different.

He doesn't think the country now has enough resources and energy to restart the original research project of ecosystem restoration.

Not that this project is unimportant, but because the most important thing now is not this, and a lot of resources should not be used on this.

However, although he did not agree with the high-level practice, Chen Xin did not interfere, but asked the high-level about it through his own authority.

In fact, it's strange that Chen Xin didn't know about it in advance.

As Chen Xin, if the state wants to restart the construction project of Dome City, he should know in advance.

In particular, he was responsible for the Dome City Project at the beginning, and now he has the most say in the dome new town. It is a very abnormal thing that the project is restarted without him.

However, when Chen Xin asked the senior management about this matter, the senior management replied that the dome city plan was not prepared for domestic construction, but intended to be used in the Middle East.

This really surprised Chen Xin, even more than the high-level directly bypassed him and confirmed it.

Although it is said that the construction of the dome city consumes resources, it is not a problem to build two new domes if it is crowded. It is just why the new dome will be built in the Middle East rather than in China?

This is a bit unreasonable.

The explanation given by the high level is that the high level responsible for the construction of the Middle East defense line feels that it is very dangerous for the population of the Middle East to be concentrated on the Mesopotamian plain. If alien creatures invade the Middle East, the residents of this region will suffer huge losses.

Therefore, the high-level plan is to move the population of the Middle East to the Iranian Plateau and let them move behind the Middle East defense line, so that they will not suffer huge losses even if alien creatures invade.

Of course, there is no problem with this scheme, but the Iranian plateau is mainly plain terrain. If it is used to build shelters, it is obvious that underground buildings are not suitable. At this time, Dome City, a large shelter building suitable for construction in plain areas, has naturally become the first choice for this high-rise.

It is precisely because of this idea that the senior manager restarted the Dome City project with his own authority and asked the domestic government to sort out the drawings.

It is precisely because of this idea that the senior manager restarted the Dome City project with his own authority and asked the domestic government to sort out the drawings.

It is precisely because of this idea that the senior manager restarted the Dome City project with his own authority and asked the domestic government to sort out the drawings.

www.novelhall.com, the fastest update of the webnovel!