It's not hard to understand.
The higher.
The more people you can put it in, the more area you can sell. You know, the land in loy is actually about free.
Around.
There are not many people in this project, even if there are, they can almost be ignored. In this case, of course, the higher is the higher.
"Is it high?" Mi Hao asked again.
"No
He shook his head in the opposite direction.
"The Indian side wanted to, but it was vetoed by the Bank of Myanmar group. In fact, most of the buildings were still low, with an increase of less than 20 percent."
"But."
"But another kind of compromise has been formed, that is to make greater concessions in some places. For example, if there are more large-scale and densely populated residential areas, it will be able to jam people."
"So."
"It's taking into account the demands of both sides."
Listen up.
Mi Hao nodded.
So it is.
The projects of the Bank of Myanmar group have always been highly demanding and highly principled. They would rather not do them than make a bunch of projects they don't like.
One should look good.
Sell more than one.
Good.
Let's plan some large residential areas for you. Other places are still the original standards. In this way, the overall beauty of loy city will not be damaged.
What's more.
With the "high standard aesthetics" of the Bank of Myanmar group, even these high-rise buildings should make up for their shortcomings with excellent design.
Yeah.
Good.
The rest is to do.
With such a party A, or a representative of Party A, MI Hao is very comfortable. He's afraid that Party A will do everything.
I also like three changes a day.
It's not like now.
It's only more than half a month.
-Financing.
-Planning.
-Design.
-Drawing.
-Bidding.
It's done. It's not just about speed. It's not about asking for financing. Just sit at home, open the door, and someone will give you money.
It's amazing.
How many developers want to cry in the toilet, envy want to hit the wall.
"That's right."
"How soon can we start?"
"Six one."
"Ah?"
"Six one."
Mi Hao
June 1.
What's the date today? On May 25, that is to say, there are only six days to go through the audit of relevant construction departments in India.
Obtain all kinds of permits.
Boss.
Are you kidding?
At the beginning.
Even for urban loans in India, there was a lot of preparation time. When they entered the construction site, it was more than half a month since the bidding time.
Now.
The amount of work has increased many times, but the time is less.
Right now.
Just listen to the opposite way:
"ha ha, don't be surprised, there are a lot of capital involved this time. It's not surprising that they are able to do a lot of things together. "
"So it is."
Mi Hao nodded.
I talked for a while and hung up.
Now.
You don't have to go to Africa.
Good.
Moreover, there are many bonuses for such a large project. For example, the bonus for the previous project is more than one year's salary.
This time.
The contract has nearly quintupled.
That's it.
As a project manager, I can get more than one million bonus at least.
It's beautiful.
。。。
The next day.
The headquarters sent the drawings.
“。。。”
Generally, there are at least ten drawings for a house, from the architectural planning to the most detailed material list, the drawings of a block, directly on the ton.
In front of you.
Sixteen blocks.
All right.
It's filling up the archives. Looking at all makes people dizzy, MI Hao mouth smoke smoke, he really a little doubt, this is a person can come out?
How long.
It's still 16 blocks. The size of the whole loy City, needless to say, is very large. Just the drawings, we need more than a dozen vans to pull it.
This kind of design task, under the limited time condition, is more difficult than hell level. However, it doesn't matter who designed it or how.
The important thing is to build.
"Hoo
Take a deep breath and take a master plan.
Meeting."We can see that this project is distributed in four directions: East, South, West and North. Some of them are connected, so there are a total of six connected areas."
"One project department for each district."
"This time."
"Because of the huge amount of work, the company will send three more deputy managers. According to the plan, the construction will start on June 1, and relevant supporting facilities will arrive in the next few days. "
“。。。”
He's a bull.
I don't care about so many districts.
So.
After all, every block has hundreds of buildings. Like a hill, it's too far to run back and forth.
"These days."
"Everyone should be familiar with the drawings and make the construction plan. Once the construction starts, the progress will not wait for others. Although the project is large, I believe you have experience."
"All in all."
"Process, process, must be reasonable planning."
"The head office will assist in the allocation of equipment and personnel. The project is large and the demand for materials is also large. Langyu County allocated a piece of land in the south. "
"Material transfer dedicated to this project."
“。。。”
Two hours later.
At the end of the meeting, MI Hao had no choice. There were too many things to do. That's what it was like to do a project, whether it was in the early stage, the middle stage or the late stage.
Fortunately.
Tired to death, not afraid of default.
Otherwise,
if you work hard for a year and can't get money, you will be upset.
。。。
After the meeting.
Get in the car.
To the Indian Burmese border.
Right now.
It's the same as when he first came here. I saw a lot of engineering vehicles queuing up. Those who came back after finishing their work had to go there again. They are busy now.
61 is the construction time.
What do you mean?
It means that we can build a house, and before building a house, there is another task, that is, three supplies and one leveling, water supply, electricity supply and road access.
And site leveling.
Otherwise.
He will not be surprised to start work on June 1. After getting the land, the three links and one leveling can be completed by himself. However, to build a house, you need to apply for all kinds of certificates.
Review drawings.
Capital audit.
Even if the construction and other departments of the state of India work together to send out more than a dozen trucks, Miho estimates that it will take a month, but now it only takes a few days.
When I see it over there, I guess my first reaction is: can I give up?
After passing the card.
In some places, the dust is flying. It is leveling the land. The land here is relatively flat, but it is much simpler. As for the three links.
It's also simple.
Dig a hole.
Buried pipe.
All at once.
For water, it's from loy City, and so is electricity. There are mature supporting facilities. There are two power plants, one for operation and the other for standby. Now it's a big deal. The two power plants can be operated together.
It's totally satisfying.
What's more.
The hydropower pipeline is not running around the whole area, but around to supply the main construction needs of electricity and water.
Such as concrete mixing.
It is directly located on the edge of the city. At the beginning of the construction, the power consumption of each block is very small, and most of it is oil for various machines.
Excavators.
Crane, etc.
As for the project department, there is solar energy.
According to the big process, when they dig pits, the construction of underground projects such as pipes and canals takes the lead. Therefore, when there is a large amount of electricity, there will be electricity.