With Monica becoming the spokesperson of dragon maid, the sales volume of maid is increasing day by day.
Orders from all over the world continue to flow to the official website mall, which also leads to the extremely hot orders on the official website, creating countless sales records.
Under Ding Zixuan's arrangement, a professional maid production team was born, and the leader of this team is Monica.
Ding Zixuan led the team to the busy Monica.
"Princess Monica, these are the first team members I found for you. They can help you jointly produce and customize maids and complete these orders in the mall."
Monica nodded and said, "thank you, Mr. President, for your support. With the help of these people, I believe the orders on the official website can be completed smoothly within a month or two."
"However, we will face a serious problem next, that is, where should we place so many maids?"
"After all, these maids are different from ordinary goods. They are all living people one by one."
"Moreover, they still have the ability to move and need to eat and rest every day. With the increase of the number of orders, there will be more than 100000 or even hundreds of thousands of maids. It is impossible for so many maids to put them in a big warehouse."
If Monica hadn't raised the problem, Ding Zixuan really didn't realize the seriousness of the problem.
Ding Zixuan said: "it's really impossible to put these maids in the warehouse. After all, they are human beings and not ordinary goods.".
"We must build a maid's manor for the maid. In this maid's manor, dozens of palace like apartment buildings should be built, these maids should be arranged in these apartment buildings, and their daily needs should be guaranteed."
Listening to Zixuan's words, Monica nodded: "Mr. President, in fact, I have the same idea as you. Indeed, we should establish an exclusive maid manor for these maids and put all these maids in this manor to live."
"Well, I'll contact Huaxia Construction Engineering now to discuss this matter," said Ding Zixuan.
After saying goodbye to Monica, Ding Zixuan called the person in charge of Huaxia Construction Engineering directly.
"Mr. President, what can I do for you?" the person in charge of Huaxia Construction Engineering Co., Ltd. has now become another person called anyalin.
The other Party replaced the original person in charge and became an exclusive project leader of Longguo, specializing in various infrastructure construction of Longguo.
Now Longguo is very powerful, with incomparably developed money and technology. It needs countless infrastructure projects.
Therefore, there must be a professional and exclusive project leader stationed in Longguo to maintain cooperation at any time.
"Manager an, I need you Huaxia Construction Engineering to help me with one thing. We need to build a luxury apartment in Longguo. There are about hundreds of thousands of people living in this apartment, so this apartment must be built very large."
"At the same time, I also hope that this apartment must be luxurious. It is like a castle. All the people living in it are women. Therefore, the architectural style should conform to the aesthetics of girls, mainly pink."
"I hope manager an can find professional designers to complete the design and start the construction as soon as possible."
Huaxia Construction Engineering now has a professional construction team, about tens of millions of people.
In Longguo alone, there are 50000 or 60000 professional construction teams.
Their work efficiency is very high. They can complete any complex building and any cumbersome infrastructure project in the shortest time.
Therefore, Ding Zixuan is full of expectations for Huaxia Construction Engineering.
"I'll give you a month and a half to finish the construction of this apartment. I don't know if there's a problem?" Ding Zixuan said directly.
Manager an was stunned and spent a month and a half to complete the construction of a luxurious apartment? And accommodate hundreds of thousands of people at the same time?
This is a very difficult thing for them.
Therefore, manager an was embarrassed and said, "Mr. President, do you need to be in such a hurry? A month and a half is really too short."
Ding Zixuan smiled.
He said: "manager an, I believe in the construction ability of Huaxia Construction Engineering Co., Ltd. and we all know that the construction speed of Huaxia Construction Engineering Co., Ltd. is the fastest in the world. Therefore, Huaxia is called the infrastructure maniac, and Huaxia Construction Engineering Co., Ltd. is the representative of the infrastructure maniac."
"I believe manager an can finish this grand building in one month."
"If manager an can complete the project within one and a half months, I am willing to triple the salary of the original workers. In addition, I have an additional 10 million for manager an alone. If you can, this 10 million is your reward."
Originally, manager an was a little embarrassed.
However, listening to Ding Zixuan's words now immediately inspired him.
After all, the power of money is infinite.
With money, you have motivation.
"Mr. President, since you are so sincere, I will lead Huaxia Construction Engineering to complete the task you assigned within one and a half months."
"OK, no problem. All my promises will be fulfilled," said Ding Zixuan.
"Thank you for your trust, Mr. President. I'll hurry to do it now." manager an also knows that time doesn't wait. He must finish this grand project and build a maid's manor as soon as possible.
Moreover, we should ensure that the maid's manor is luxurious and practical.
Soon, manager an stopped all the work at hand and asked all the workers to stop the existing project. All the workers of Longguo were mobilized together to finish the project against time.
At the same time.
Manager an called the overseas company and asked for another 100000 workers to work here. Be sure to arrive in two days and make preparations for the maid manor.
The Chinese engineers were very efficient. In just one day, they completed the planning of the whole maid manor.
In addition, within two days, all excavators, cement mixers, soil compactors and all machines are ready.
Moreover, 100000 workers were mobilized from overseas and all arrived in two days.
On the third day, the project was officially started.
The preparatory work only took two days, which is a very short time for a large-scale project.
Ding Zixuan personally inspected the project from time to time during this period.
He found that the progress of the project was faster than he expected. The workers were divided into three shifts and worked in turns to ensure that the whole project was carried out continuously within 24 hours.
At the same time, even during meal time, half of the workers are working, and the other half go to dinner and change jobs in turn to ensure the uninterrupted completion of the work.
In only five days, all the foundations have been completed.
Within 10 days, all materials have been prepared, and the construction of reinforced frame and work on the foundation have been started.
From the 15th day, all the work on the ground has been prepared and started to build towards the wall of the building.
On the 30th day, ten luxurious maid manor buildings have been built as a whole.
It took another 10 days or so to finish all the decoration work inside the manor building.
Five days later, all the furniture and daily necessities in the manor were ready.
Three days later, greening has begun.
Five days later, the water and electricity were connected, everything was ready, and only the last greening was still in progress, which did not hinder the maid's check-in.
In only one month and 20 days, the whole luxurious maid manor has been completely built.
I'm afraid the whole world will be shocked by the speed of construction.