This is an arduous task. Even if it can be completed in 15 years, it is already quite contrary to the sky. Qin Guan knows that it takes 20 years to be prepared for success. However, he can't wait any longer. It's time to start the project.
In 6624 Institute, Qin Guan investigated all day. The next day, the first fund had been allocated by the company, and Qin Guan couldn't wait.
The next day, Qin Guan went to factory 4460 with the others.
The two units are not far apart. It's more secluded here.
At this time, it was time to go to work. I saw a famous worker, wearing uniforms and riding a bicycle, heading towards the factory. The factory was clean and tidy, and the trees were lush.
"All leaders are welcome to visit." director Zhao and others came out to meet him personally. Looking at the arrival of Qin Guan and others, their faces were full of joy.
"Well, let's just take a look." Qin Guan continued his last strategy and said, "what does our factory mainly produce now?"
"We are working on the production of turbojet-7 engine and the mapping of turbojet-13 engine." director Zhao said: "comrades are full of energy and strive to complete the mapping imitation of turbojet-13 as soon as possible."
Hearing what director Zhao said, Qin Guan was stunned.
Yesterday, I had proposed the next generation engine with a thrust to weight ratio of 10. When I came here, it seemed as if I had regressed for more than ten years, and the mapping imitation of turbojet 13 began here?
That year, the door of the motherland had just been opened and the mig-21mf fighter was brought back from abroad. The fuselage of the fighter was given to the 1132 factory to map and imitate the j-7-3, and the engine of the fighter was thrown to a factory. The mapping imitation was turbojet-13
According to a lot of data from later generations, turbojet 13 is a new and improved engine based on turbojet 7 engine, with further improved performance, especially stability and reliability. In fact, this is a golden saying on my face. This engine is no different from turbojet 7, It comes from the p-13f-300 engine imitated from mig-21mf.
However, with the rapid development of domestic aviation technology, the J-8 has not been valued by the air force, and there is no order for one. The J-7 is also a low-grade aircraft. Is it still engaged in turbojet 13 at this time?
Qin Guan is a little strange.
Under the leadership of factory director Zhao, everyone walked into the production workshop and looked at the busy workers. Factory director Zhao said: "our factory has an annual output of about 100 turbojet-7 engines. This engine is still the main power system of our J-7 fighters."
Qin Guan nodded and suddenly thought of something.
The air force has no money.
Now, for the air force, the favorite fighter is the J-11 heavy aircraft, followed by the J-10, which is about to be developed. These two will become the main fighters in the future.
However, the prices of these two types of fighters are very expensive. There are still a large number of old J-6 fighters in the air force that need to be upgraded. What can be used to replace these fighters?
There is still a market for the J-7, which can at least continue to maintain a sufficient scale. Therefore, in addition to exporting to foreign countries, the J-7 will also have a certain market at home and will continue to develop.
Then, with the continuous development of the J-7, the lack of power of turbojet-7 will appear. At this time, turbojet-13 still has a market.
Don't just focus on the world's advanced level. There are still many poor countries in the world. The J-7 fighters continued to improve and develop in the 1990s, and there is a demand for engines.
"Yes, to what extent is the mapping of turbojet-13?" Qin Guan continued.
The characteristic of this era is that there will be some technicians in a factory to form a research room in the factory to carry out scientific research activities. The vortex jet-13 has fallen to plant 4460. I don't know how the research and development is going?
After all, in the history of that parallel world, it was not until 1988 that the surveying and mapping imitation was completed.
Hearing Qin Guan's question, sure enough, director Zhao's face was also ugly: "The progress of the project is slow. The superior handed over the project to us two years ago, but then the superior just ignored it. We made several reports and applied for funds in the hope of developing the project. The superior also didn't reply. Now our factory mainly relies on the income of turbojet-7 to maintain the development of turbojet-13. I don't know how many years it will take 。”
Fortunately, the enterprise has been restructured. Although the old industrial base is also producing turbojet-7 engines, the quality of their production is not as good as that of factory 4460, so factory 4460 can produce at full capacity. Almost all the money earned from selling engines is invested in surveying and mapping imitation.
However, after all, the factory still has other expenses. It's too difficult to rely on the factory's own strength to carry out scientific research. Factory director Zhao said: "if we didn't want to have a follow-up engine for the J-7 fighter, we really don't want to do it. We'd leave it to our brother factory to do it well."
This sentence immediately moved Qin Guan. Yes, why didn't you think of it?
"Absolutely. The project of mapping and imitating turbojet-13 can be handed over to brother 4410 factory." Qin Guan said: "you'll make a report and the superior will approve it."
The 4410 plant originally built a turbofan 6. As a result, it was a speechless project. Now, although the new generation engine project allows them to compete with the 4430 plant, it can not compete in any case. Instead of decaying the plant, it is better to give them a new project to build turbojet 13 and reserve an engine for the J-7, It can also be used for their J-8.
Hearing Qin Guan's words, director Zhao was puzzled: "are we doing anything else?"
If any factory does not look forward, it will be eliminated sooner or later. Although they are still producing turbojet 7 engine, it is inevitable that this engine will be eliminated. They also need to develop new models.
"You need to undertake an extremely confidential project." Qin Guan said, "we have imported a batch of production equipment from abroad, which is used to produce advanced zhongpusher engines. It is the same level as f404. Are you confident in operating these equipment and producing the most advanced zhongpusher engines in China?"
Same level as f404? When he heard this, director Zhao was overjoyed.
Turbojet VII is for the J-7. He has also been to factory 1132 many times. He has seen the j-14 fighters produced there. He is drooling with envy. If their factory can provide the j-14 with supporting facilities, it would be a big step immediately.
"You will also get the technical support from the comrades of 6624 Institute. However, the biggest feature of this project is secrecy. Confidentiality must be done well. Are you confident?" Qin Guan asked.