As soon as the voice of the staff fell, they quickly apologized to Shen Zong and oginlike, and hurried to the truck with a folder to start their work.
As for Shen Zong and oginlike, when they heard the words "high-power gas turbine taking off in China", they were already confused.
Did China Tengfei actually produce a high-power gas turbine?
When did they get it out?
How many years has it been from small power gas turbine to high-power gas turbine?
Is China's take-off open?
A series of question marks kept swiping the screen on the forehead of Shen Zong and oginlike. There was time to care about the staff who had left. When they were ready to ask about the specific situation, the staff member had long disappeared.
But at this time, the truck has entered the test site, which is far different from the blur just now. At this moment, the outline of the whole truck is quite clear, but because of this, whether it is president Shen, aojinlake, or the staff of Siemens, Mitsubishi and other gas turbine manufacturers, they are surprised to see this scene.
So that President Shen incredibly pointed to the slowly stopped truck and shouted, "it's impossible... It's impossible... How can a high-power gas turbine be transported as a whole by a standard truck? It's impossible... It's impossible..."
In fact, not only president Shen, but also other people in oginlike think so. Even the staff of the west to east gas transmission project team were surprised when they saw the real face of the transport truck.
However, these people are more implicit and don't say what they think. Unlike president Shen, they have an instinctive resistance to China's take-off competitor, so they don't care about any implication and call it out directly.
Of course, we can't blame the people on the scene for such a reaction. It's really that the means of transport used by China Tengfei is too surprising, because the heavy trucks use ordinary Trailer heavy trucks that meet the civil road safety standards.
The payload is only 35 tons.
Regardless of size, the load alone is already surprising.
The 20 MW high-power gas turbine is also a complete set of integral transportation of core power, sound insulation integral box and shock-absorbing floating raft base, which is actually no more than 35 tons!
What does that mean?
China's high-power gas turbines are not generally light, but light to the extent of changing ~ ~ ~ state.
You should know that the total weight of da-80t of China Aviation Development Corporation is nearly 60 tons, which does not mean that it can not be transported by truck as a whole. It only needs to apply for the road license of special equipment and be equipped with relevant special load vehicles.
But the problem is that the weight of da-80t plus the tonnage of the truck itself, with a total weight of nearly 80 tons, is no problem for the key highways, but other ordinary highways and bridges can't bear it.
This is why da-80t can be transported by heavy truck as a whole, but it doesn't take place in the end. That is, the road to the test site can't bear such a heavy weight at all. Since it can't drive in, there's no need to do that kind of useless work.
The same is true for ge-2800. Although its weight is lighter than da-80t, it also exceeds 50 tons. More importantly, due to the loading of intermediate cold and heat circulation system, the size of ge-2800 is larger and the transportation is more inconvenient.
But now, China's high-power gas turbines do not use special heavy-duty trucks, but the most common civilian trailer trucks, and they are transported as a whole at one time.
Not only does the weight not exceed the upper limit of the truck, the size also meets the bearing requirements of civil truck trailers.
As the saying goes, we can see from this point that China's take-off has made great efforts on this high-power gas turbine.
At least, the details are well grasped, and factors such as domestic road transportation status and truck ownership are fully considered.
This is very friendly to customers.
We should know that both da-80t of China Aviation Development Corporation and ge-2800 of Ge need on-site temporary assembly regardless of the duration, which is equivalent to increasing the construction cost and construction cycle for customers. Of course, the transportation cost of segmented transportation is also high.
China's high-power gas turbines are different. They can complete one-time transportation by using ordinary civilian trucks, which not only eliminates the subsequent construction and construction, but also reduces the transportation cost. This alone has won the keen attention of the leaders and experts of the west to east gas transmission project team.
After all, no one's money comes from the wind. Naturally, it can be saved.
Of course, the most eye-catching is the executive deputy leader of the project team of the west to east gas transmission project. The leader who has changed his career in the field of naval equipment can't help nodding at the high-power gas turbine on the trailer.
Under the thick lens of the wine bottle, a pair of eyes shine with excitement.
It can be transported by ordinary civilian trucks as a whole to reduce unnecessary costs. Secondly, the most important thing is that the overall weight of China's high-power gas turbine is too in line with the requirements of the Navy.
Less than 35 tons, compared with the total weight of da-80t58 tons, it's not too close to the people.
We should know that although the space of large warships is not small, it is also the place where every inch of land and money is. If the power equipment is too heavy, it is bound to occupy the setting of other important equipment. Therefore, it is also the goal of the navy to reduce the volume and weight of main equipment on the premise of ensuring performance as much as possible.
Because of this, the significance of China's take-off of this high-power gas turbine is obvious. It can save more than 20 tons of space at once. Whether it is to add a vertical engine system or a more advanced electronic information countermeasure module, the navy has more choices.
The most important thing is that the total mass of less than 35 tons also makes China's high-power gas turbine very adaptable. For example, the 054A missile frigate with medium speed diesel engine can be used as the active force in the future.
In a word, the future of this high-power gas turbine taking off in China can be expected!
The executive deputy leader of the project team who couldn't close his mouth with a smile turned around the truck and hurriedly met Zhuang Jianye who had just come down from the off-road vehicle: "ha ha, President Zhuang, your gas turbine looks good. It can be transported by ordinary civilian trucks. It shows that you have done a lot of work in details. Tell me what the total weight of your gas turbine is?"
"Oh, leader, I'm almost embarrassed by what you said!" Zhuang Jianye hurried forward to hold the hand of the executive deputy group leader with a sincere smile on his face: "Weight control has always been our weakness, and the same is true for this d-71m gas turbine. Originally, we expected the total weight to be controlled below 25 tons. As a result, the overall integration is poor and can only be maintained at the level of 27 tons... Shame... Shame..."
When the executive deputy group leader heard the speech, his voice changed like seeing a ghost: "it's only ~ ~ 27 tons ~ ~ ~ it's less than 30 tons ~ ~ ~"