For example, the most important engine projects in China have made breakthroughs because of various high-performance materials provided by infinite gravity group!
All kinds of fighters and big planes have been cured of heart disease! This alone will greatly increase the influence of infinite gravity group!
Not to mention those "peace couriers". After using new materials, not only has the number of missiles loaded become larger, but also the flight speed and flexibility have made a qualitative breakthrough!
It can bring "peace" to the enemy more quickly and break through the enemy's defense network faster and more unstoppable!
There are also various upgrading projects of nuclear submarines, all of which are related to various batteries and materials of infinite gravitation group. All these influences are unknown to ordinary people, but they exist.
These hidden influences are also one of the reasons why the infinite gravity group can successfully carry out various cooperation with the state, such as the hadron collider project, rocket project, etc., because of this influence, the green light has been passed all the way.
Not to mention the nuclear fusion energy development project that has just been approved recently. For such a sensitive project as nuclear fusion energy, even if an ordinary company applies for it, the state will only treat you as a joke.
After infinity gravity applied, it immediately became the focus of the project, because the state knew that their company could indeed solve this problem.
Such a big influence is the reason why the company has always been so confident. It is known that as long as you don't die, the country is the biggest backing of the company!
Want to put pressure on infinite gravity? One source of confidence in the firm's aggressive response is also provided by these influences.
The headquarters of the company has not been affected by this incident, especially the company employees at the South Island "Gaia" rocket launch base thousands of miles away.
They have to be very busy these days. Even if they know the company's troubles, they don't have the mood to pay attention to them. It's their work tasks that are too important.
Two space telescopes and three geostationary satellites have all been delivered to the launch site, where they will be tested for the final time.
In addition, although the first stage engine of the rocket has passed the launch test, a comprehensive test is needed to make them meet the launch needs again.
Not to mention the two-stage rocket, there are two-stage rocket integrated system test, such as the separation of the first and second stage rocket, fairing separation, second-stage rocket ignition and other steps, which have to go through many simulation tests.
Of course, there are many other testing and monitoring tasks that need to be carried out simultaneously. There are too many things to be done to successfully launch these five carriers into space according to the scheduled launch plan years ago!
Launch preparation of launch vehicle involves a wide range of aspects, including inspection, test, transfer, propellant filling, calculation and binding of launch program and data, ignition and launch, tracking measurement, safety control, measurement and control communication, ground service support, etc.
As we all know, the launch site of launch vehicle is generally composed of technical preparation area, launch area, command and control center, measurement and control communication system, ground service support system and other major departments. When the launch vehicle arrived at the launch site from the manufacturer, the launch preparations of all departments began to start.
The launch vehicle first enters the special workshop in the technical preparation area. Here, the instruments and equipment on the arrow are tested separately to check their performance and accurately measure their parameters.
After the unit test is qualified, the subsystem test is carried out. It is to check the coordination and function of each instrument and equipment in the system when the system is in working state, and measure its working parameters. Then, the matching test is carried out among the subsystems to check whether the work between the systems is coordinated and matched.
Finally, a general inspection is carried out for all systems on the rocket, which is usually carried out several times to simulate various flight states to verify the technical performance and reliability of the whole system of the launch vehicle, and make the rocket meet the requirements of the launch state.
After the general inspection, various initiating devices and devices were installed on the launch vehicle, and preparations were made for the transition.
When the launch vehicle and spacecraft carry out technical test, the TT & C communication system in the launch site should be tested jointly. First, the field equipment joint test is carried out, and then the joint test is carried out with the TT & C stations, TT & C centers and survey ship equipment distributed all over the country and even in the world.
At the same time, the ground service support department debugged the launching equipment and filling equipment; the meteorological support department opened the meteorological information network and weather meeting business network, started the meteorological measurement radar, and started the long, medium and short-term weather forecast.
With so much testing and preparation work, the company's attention has been focused on this period of time. As for the contradiction with those companies and countries that covet the company's artificial intelligence system, few people pay attention to it.
After all, we all know that our company will never suffer losses in such things, and the fact has proved this point. Instead of caring about this, we should pay more attention to the company's five rockets in a row this time!Xiong Antai of the rocket laboratory and Zhang hanxiu of the deep space laboratory were all nailed to the launch base during this period of time, and all the people in the two laboratories had to stay to continue the experiment, and all the rest had been pulled over!
This launch mission is the most important beginning of the company's space program. If all the payloads are successfully launched, it will prove that the company has mastered the launch and recovery technology of rockets!
This will be of great help to the heavy launch vehicle and space station projects currently being developed by the company. At least it can prove that the company has the strength to carry out so many projects!
The reason why we are so nervous now is that this series of launch missions will be a solid cornerstone of the company's space program.
If there is a problem with the launch, the company's various space programs will inevitably be affected, which will make the company's researchers deeply hit!
So now all the people at the Gaia launch site are fully committed to these pre launch testing and monitoring projects.
Of course, because of the cooperation with the National Space Department, there are many experts from the space department here to help. Their rich rocket launch experience is very helpful to the infinite gravity group!
www.novelhall.com , the fastest update of the webnovel!