Chapter 216 Lihe Reservoir Water Storage
Qu Mao and Su Yan didn't have a good rest in Li Village at night. Li Village was deeply damaged by the heavy rain, and the upstream Li River Reservoir didn't know what to do.
When they were in Sky Island, Qu Mao and Su Yan didn’t feel that there was anything bad about the heavy rain. Instead, they felt that the heavy rain provided convenient conditions for planting grass in Sky Island.
But when they came to the outlying islands and found out that the outlying village had been hit by a disaster, Qu Mao and Su Yan's hearts became heavy.
I hope that the water blocking dam project of the Lihe Reservoir will not be affected too much. After all, in that project, the Yi Village territory has already invested too much resources and residents. It can be said that the water blocking dam of the Li River Reservoir has been invested in Yi Village There are too many resources in the territory, and Qu Mao and Su Yan can no longer afford the loss of the dam project.
The next morning, without even having breakfast, Qu Mao and Su Yan headed north to the small village under the protection of a team of third-tier princess guards.
Just turning from the source of the Li River, along the mountain peak to the edge of the valley, Qu Mao was still halfway up the mountain when he saw that the whole valley was full of water.
It seems that the torrential rain has caused the Lihe Reservoir to store water in advance, after all, it has been raining for three days and four nights.
Following the jungle after the rain, Qu Mao and Su Yan finally came to Beixiang Village under the protection of the third-rank princess guards. When they passed the construction site of the water blocking dam, there were no people working on the construction site.
In the fourth-story brick house in the small village of Beixiang, Qu Mao and Su Yan found Kong Ming and Chafidel.
Kong Ming bowed his hands and saluted: "My lord, Lord Su Yan, why are you two here?"
Su Yan said: "Lord Kong Ming, my lord and I arrived at the empty island four days ago. We originally planned to rush to the outlying island immediately, but were blocked by the heavy rain for three or four days.
I only arrived at Li Village yesterday afternoon. The north bank of Li Village was destroyed by floods. The adults were worried about the Li River Reservoir Project, so they rushed here without even having breakfast. "
Kong Ming immediately greeted Village Chief Kong Gang and said, "Kong Gang, hurry up and prepare breakfast for the two adults and the soldiers escorting them."
Qu Mao asked: "Kong Ming, has the water retention dam project of the Lihe Reservoir been affected? On the way here, I saw that the reservoir area is full of water."
Kong Ming stopped shaking his feather fan, and said, "My lord, this is the source of the Li River, and the small village north to the north is also built on the mountainside, and the heavy rain hardly affected us at all.
It’s just that the water retention dam of the Lihe Reservoir is still in the foundation building stage, and we haven’t reserved a gap on the dam. The base of the entire dam has been exposed to the ground by about one meter, so the Lihe Reservoir has actually completed water storage at a depth of one meter.
After the rain stopped, the subordinate also re-inspected the reservoir area and the water-retaining dam. For the time being, they are not going to remove the base of the water-retaining dam, which is only one meter high.
The original plan was to check the dryness of the ground outside the reservoir area this afternoon, and then decide whether to start work in the afternoon or tomorrow morning. "
Qu Mao said: "Don't worry, there will be no problem after observing for a few more days..."
Talking about the reopening of the water retention dam of the Lihe Reservoir, Qu Mao also told Qu Mao the reason for the barren land about 200 meters away from both sides of the river.
Kong Ming said: "Master, unexpectedly, a rainstorm helped us find out the cause of the phenomenon that has troubled us for a long time. It is a blessing in disguise."
Chafidel said: "My lord, you don't have to stay here all the time when the construction starts again, right? The flood has destroyed a lot of vegetation. It stands to reason that there should be no wild beasts to harass the construction leaders."
Qu Mao waved his hand and said, "Chafidel, I don't need to tell you the importance of the Lihe Reservoir Project, you will definitely have to stay for a while longer.
I have asked Jia Sixie and Jia Chongde to simultaneously construct the dam away from the north bank of the river. Temporarily build a one-meter-high dam until it reaches the waterfall, and then turn around and gradually increase the height. I also asked them to widen the waterway between the two banks by about one time. .
I also know that after the successful construction of the Lihe Reservoir, it will have certain functions of storing water and regulating the amount of water in the Lihe River.
However, the flood caused by the torrential rain made us clearly realize two points. The first is that the Lihe dam must be accelerated. Knowing when there would be another round, Li Village couldn't bear such a second loss.
Secondly, the dam project of the Lihe Reservoir must be steadily advanced. The construction project cannot be taken lightly, and it may be thicker than the original plan. The flood of the Lihe Reservoir made us realize the power of water flow.
So you should be prepared to be stationed in Beixiang Village for a long time. I don't want any mistakes in the Lihe Reservoir project. "
"Okay, my lord!" Chafidel said helplessly.
The village chief Kong Gang delivered breakfast in person. While Qu Mao and Su Yan were eating breakfast, Kong Ming also explained that he had considered the optimization of the water blocking dam project plan after leaving the river flooded.
After breakfast, Qu Mao wiped his mouth and said, "Kong Ming, I think the improvement ideas you just mentioned are very reliable."
Then Qu Mao took out a pen and paper from his backpack, and said while drawing: "According to what you just said, I further thickened the design.
In the early days, we planned a 120-meter-high water-blocking dam, with a 20-meter lining at the bottom; just now you said that two layers of linings will be built, and the bottom lining will be built to about 40 meters.
I don’t think it’s possible. When planning to build a 120-meter-high building in the early stage, I didn’t see the power of floods. So I think a layer of lining is built every ten meters high, the top of the water blocking dam is 5 meters wide, and each layer of lining is 5 meters wide. The 11-layer lining is 55 meters, plus the width of the dam crest, which means that our bottom lining is 60 meters wide.
Considering the convenience of passing from the top of the dam, the top floor may have to be designed with a width of 10 meters, and for our convenience from the bottom of the dam to the top of the dam, the bottom layer must be pulled to about 150 meters, which means that our stone materials must be increased at least More than five times the budget.
Su Yan, please contact Sunan. "
Kong Ming watched in astonishment as Su Yan took out the communication crystal and spoke directly to Sunan, then took Qu Mao's words and said, "My lord, I understand what you mean.
Please allow your subordinates to adjust the construction of the water blocking bus by themselves after the test. "
Qu Mao nodded, handed the sketch he had drawn to Kong Ming, and said, "Of course, I'm just following your words and sharing my thoughts with you, and the details are based on your actual decision-making." .
You judge and analyze as soon as possible, and speed up the construction as soon as possible.
Su Yan uses a communication crystal, which is prepared for the village chief Jia Chongde in Li Village. Heroes will be equipped with the top communication crystal.
Tonight, Su Yan and I will go to the small village to rest in the north. By the way, let Sunan send me and Su Yan the first two top-equipped communication crystals. Yours and Chafidel’s will be later, but Village Chief Kong Gang’s We can send them together.
Tomorrow, Su Yan and I will go to inspect the construction of the shipyard and Fulou Village. "
Kong Ming said with a smile: "My lord, please go ahead, it will be much more convenient with the communication crystal."
(end of this chapter)